Aldeburgh Pier

Main Menu | Places & Properties A to Z


ALDERBURGH PAST | Construction of Aldeburgh Pier began in the 1870’s but sadly the half-complete structure was hit by a barque and further construction work stopped. It was finally demolished in 1909.


Aldeburgh’s partially-completed Pier.
It was demolished in 1909.

In the 1870’s, Aldeburgh had a Pier north of the lifeboat station, near to the Moot Hall, but sadly it was not even half-complete before a Norwegian barque hit it causing considerable damage. The promoters suffered financially and the pier fell into disrepair, remaining a blot on the landscape for a further 25 years until it was eventually demolished.

Aldborough Pier Designs

The design engineer was Thomas Cargill and the contractor was G. W. Hutchinson. The new pier was intended to be 567 feet long with seventeen equally spaced spans of 33 feet. Its width was 15 feet. At the head of the pier the platform would widen to an impressive 100 feet to provide a spacious area on which a handsome pavillion could be erected.

Map of Aldeburgh in 1881 showing location of unfinished pier marked “QUAY”
Reproduced with the permission of the National Library of Scotland
1864JulAldborough Pier and Railway Bill authorising the construction of the pier was read a third time and passed by the House of Commons.
1871NovProposal by Aldborough Pier and Railway Company to build two piers, a South Shelter Pier and a North Shelter Pier either side of a harbour cutting near Slaughden.
1875Dec 6Aldeburgh Pier and Improvements Company Limited registered with capital of £7,000 in £5 shares. The Directors were Colonel Arthur J.B. Thellusson of Thellusson Lodge, , Captain Henry Haughton James of Wyndham House, James Murray Dale of Rowley House and John Fry of Saxmundham. Among the first Aldeburgh subscribers with 2 shares each were James Murray Dale, Anthony P. Turner (bookseller), Henry John Wright (builder) and Henry J. Beart (hotelkeeper).1 The Engineers appointed were Messrs. Bryant & Cargill. The Secretary was William Reading.
1876Aldeburgh Pier and Improvements Company Limited authorised by The Aldeburgh Pier and Improvements Order 1876 to construct a pier commencing on the sea beach near Moot Hall and extending seaward to the distance of 145 yards.
1877Pier construction is commenced by contractors Messrs. Whitmore and Binyon of Wickham Market. About 60 feet is completed. The capital of the Aldeburgh Pier Company was £7,000 in £5 shares but only a comparatively small number of shares were taken. Apparently £2,000 had been promised by the inhabitants of the town but only £200 had been forthcoming.
1877JulAnnouncement that the Aldeburgh Pier Company is to be wound up.2
1877JulReported that cast iron piles have been driven down as far as low water. Great difficulty has been experienced in driving them in, as at 17 feet a sand strata was found, like rock, which it is not proposed to go through. They are now awaiting some special columns to receive the girders, when these will be put in place.2
1877NovAn action was tried in the High Court of Justice, Chancery Division, in which Mr. Higgins, a partner in the firm of Cargill, sought to recover the costs of certain plans for the Aldeburgh pier. On the Aldeburgh Pier Company‘s undertaking to pay £150 into court within a fortnight, the petition was referred to Chambers to inquire as to liability.
1878FebPetition to wind up the Aldeburgh Pier and Improvements Company Limited withdrawn by former engineer.
1878MarReported that the pier, which was partially completed last year, seems likely to be re-commenced shortly with renewed vigour. Several influential and energetic gentlemen have been invited to a seat at the Company’s Board as Directors and it is hoped they will accept the position so that by the introduction of ‘fresh blood’ and united action the Aldeburgh Pier and Improvement Company may carry out their promises, and push forward the works without further delay.3
1878JunA general meeting of the Aldeburgh Pier Company was held at the Town Hall. Mr. Flintham, a director, presided. After some remarks from the solicitor to the company, Lieutenant Samuel Smyth, Mr. Edward Neeve of Leiston and Mr. James Osborne, honorary secretary to the Lifeboat Society were appointed to dispose of the remaining shares.
1881Dec 13Partially completed pier and all construction plant and materials put up for auction by Messrs. Bromley, Son & Kelday.4
1882Jan 2Partially completed pier and all construction plant and materials put up for auction by Messrs. Bromley, Son & Kelday.5
1883FebNorwegian barque Lovely broke up and part hit Pier carrying away two end piles and girders etc., and knocking down two of the centre piles as well.
1883Oct‘Well-known local firm’ received orders to partially repair the damage done to the pier, but it is not clear whether such orders were carried out.
1884MarApplication made to Board of Trade by promoter John Hazel Fuller for revival of powers conferred by 1876 Order and authority to make pier 204 yards long and erect a pavilion on it. Estimated cost £7,000. The Board of Trade propose to proceed with the Order.((Woodbridge Reporter, 13 March 1884))
1886JunTenders invited for pulling down the pier and the girders, brackets, piles and material.
1886DecNew Aldeburgh Pier company registered with £12,000 in £1 shares.6
1887JanIt was understood that the work of construction will shortly be commenced.7
1891 JunSamuel Wightman Smyth purchased the pier and Mr. James Richardson of Limehouse was contracted to remove the ironwork, leaving ‘a portion of the pier for further development’.
1906AprDeath of Samuel Wightman Smyth, owner of the unfinished pier.
1908NovMinuted that “the council must demolish the rusting old pier head which disfigures the Crag Path.”
1909NovPier finally demolished and auction held on beach for rusting ironwork and broken bricks.

It is understood some of the foundations were dug up during the Second World War when defences were being built. The final two piles were removed when the sea wall was built.


When I was very young they started to build the pier at Aldeburgh; and it got well out into the sea when a ship got wrecked, and it washed off during the night and went right into the pier. My father said he didn’t know whether it was their hearts or their pockets, but they never built the pier any more. But they took the part down that was furthest out to sea, and left the other part for quite a few years. And boys and men used to go on to the pier to fish. … They took the part down that was in the sea and left three or four piles standing on the beach; and the fancy brickwork that was going to be the entrance to the pier, they left that standing. The pier stood right opposite the Moot Hall. I could come down Church Hill and I could have went straight on to the pier. It was built of round iron piles; and I can remember the cross-work that bound them together. …

William Robert Ward aka Busman Bill (1878-1978)


  1. Woodbridge Reporter, 30 December 1875 [↩]
  2. Framlingham Weekly News, 21 July 1877 [↩] [↩]
  3. Framlingham Weekly News, 16 March 1878 [↩]
  4. Chelmsford Chronicle, 9 December 1881 [↩]
  5. Chelmsford Chronicle, 13 December 1881 [↩]
  6. Liverpool Journal of Commerce, 3 January 1887 [↩]
  7. East Anglian Daily Times, 3 January 1887 [↩]